The project is to surface an existing earth road. The agreed condition, is that local government will undertake civil works (drainage) and SLTA carry out surfacing work with asphalt. However, the correct alignment of the road needs to be established before the surfacing works can start, as the existing road at certain section runs over private properties. The correct alignment is expected to be finalized soon.