Contractor: TCH Pty Ltd
Cost: SCR 350’000.00
Work Completed: 100%
Date Completed May 2021
The project was initiated due to the heavy flow of surface water that floods the road .There were two culvert in the area that was taking some of the water but with time it was no longer sufficient. So we had to elevate the road level and construct two bigger culvert to cater for the amount of water.